Last of the top glass done and bogged . Bottom will get bogged next .
Total top layup from core;
3 cm wide strip 4oz glass along stringer
4oz glass patch around fin box area.
4oz glass all over blank.
3mm divinycell core. 3mm HD EVA core on rails .
4oz glass all over.
Mini 12 oz glass patches over strap plugs .
carbon , innegra patches over fin and mast boxes , nose and under heels.
6oz glass over mast box , under heels , under foot pad area .
4oz glass from in front of mast box back.
4oz glass all over top.
Should be strong enough.